I needed to put the pipes in for the radiator that will be in the Utility room and Beth's bedroom. The old copper pipes were so tightly plumbed in I decided to re route the main 22mm pipes that take the central heating upstairs.
They go up the wall in the downstairs toilet and come up under the floor in Rebekah's room.
First I had to put in the new 22mm plastic pipes. They are so stiff its like wrestling an Anaconda.
Here are the tails for Beth's room radiator.
And the ones for the utility room.
So its all in. Time to presurise the system.... and HURRAY!!!! no leaks!
I still have to do this all again ... at least once if not twice to do the rest of the system.